First, the selection is very important
To ensure the antifreeze of instruments and meters, the selection of products is a key. When installing the instruments in the early stage, the users of the meters should consider the working conditions of the instruments and choose the instruments with insulation devices. According to the type of use of the instrument and the geographical location to be installed, the insulation and antifreeze requirements of the instrument are proposed and submitted to the manufacturer for processing.
The general consideration of the selection is the practicability and economy of the instrument. The practicality means that the maintenance is convenient, the measurement is accurate, and the economy is cheap. The two should be combined with each other, and mass flow meters, metal rotors, and electric targets should not be used only for convenience and maintenance. Therefore, I think that correct selection is only a measure of antifreeze and anticoagulation. When installing the instrument, the anti-freeze and anti-condensation of the instrument should be fully considered. For example, the pressure guiding tube should be as short as possible, and the sewage should be patrolled and cleaned. It should be easy to heat up, etc. Otherwise, the best selection will not work.
Second, insulation and heat is very important
Insulation measures! Insulate with insulation materials, that is, use insulation materials to wrap the parts of the instrument that are easy to freeze or freeze. In winter, it is necessary to inspect and regularly discharge the sewage to prevent damage to the insulation material of the package. Heat tracing measures! Steam heating measures: use tube steam heating insulation. Before the steam is supplied in winter, check whether the steam insulation pipe is unblocked or blocked. The best steam is 24 hours, not too hot, and sometimes adjust the steam supply according to the temperature change to prevent the temperature from being too high, so that the condensate vaporization in the pressure tube of the transmitter affects the operation of the transmitter or the temperature. Too low makes the transmitter condensate in the pressure tube of the transmitter to affect the smooth operation of the transmitter.
Third, maintenance measures are very important
Maintenance measures: 1. Installation measures: Reasonably choose the installation location, dry, no rain and snow dripping. 2. Checking measures: If there are conditions, the special person shall daily confirm whether the thermal insulation material is damaged or not, and the technical confirmation and technical disposal of the steam pipeline. 3. Alarm measures: Conditional equipment can be installed with sound and light alarms for steam leakage or power failure to facilitate the discovery and timely remediation of hidden dangers of thermal insulation and antifreeze measures. 4. Inspection measures: The responsible person of the regional instrument maintenance shall conduct regular inspections according to the scheduled inspection route. During the inspection, it is necessary to check whether the insulation pipeline valve is normal, whether the insulation tank is normal, whether the hydrophobic device is normal, whether the insulation material packaging is intact, and whether the electric heating supply component is normal. Focus on the inspection of the easy-to-freeze instrument and make a good inspection record, carry out the instrument, its heat preservation and anti-freezing measures for dry, complete and clean maintenance, and timely solve the problem of heat insulation and heat generation happening on site.
How to connect the mobile phone to the PTZ Indoor Camera How to connect the mobile phone to the monitoring camera
1. Place the camera in position and connect it correctly to the monitoring settings.
2. Since the connection with the mobile phone requires a network, connect the router to the computer. After debugging, insert one network cable into the router and the other into the camera, and then connect the power supply.
3. At this time, turn on the computer, turn on the background of the camera, click [Wireless Function], select [Connect to Wireless Router], and then click [OK] to indicate that the installation is successful.
4. You need to find a network remote monitoring system client corresponding to the mobile phone system and install it on the mobile phone. WiFi camera 1080P hidden
5. Log in to the network remote monitoring system client, click the icon [Add Device], enter the user name and password of the home network monitoring camera, and click Save.
6. At this time, you can open [Device List], and its page will display the name of the remote monitoring camera. You need to click the device name, and then click the channel icon above to successfully connect.
PTZ Indoor Camera,Mini size WiFi ip camera,300 mah rechargeable battery,Motion DVR Hidden Spy Camera,Mini Hidden Spy Camera
PTZ Indoor Camera,Mini size WiFi ip camera,small Battery Camera PTZ,Motion DVR Hidden Spy Camera,Mini Hidden Spy Camera
Shenzhen Fuvision Electronics Co., Ltd. , https://www.outdoorsolarcameras.com